Firewall Forward
Miscellaneous
March 11, 2010: Ordered Engine
April 30, 2010: Picked Up Prop and Governor
May 6, 2010: Engine Arrived!
May 21, 2010: Received Exhaust
Firewall Components
April 8, 2010: Worked on Battery Box and Contactors
April 9, 2010: Started Installing Battery and Starter Contactors
April 10, 2010: Powdercoated Battery Box Components
April 11, 2010: Fit Battery Box and Finished Contactors
April 12, 2010: Worked on Brake System
April 14, 2010: Finished Parking Brake Line and Cut Hole For Heater Box
April 16, 2010: Heater Box, Firewall Recess, Fuel Vents
May 14, 2010: Engine Fittings, Firewall Pass-Throughs
May 26, 2010: Fuel Vent, Brake Pedals, Brake Fluid Reservoir
May 27, 2010: Pressure Transducer
May 29, 2010: Worked on Firewall Components
June 3, 2010: Battery Positive Cable, Mixture Bellcrank
June 5, 2010: Firewall Forward Wiring
October 23, 2010: Changed Manifold Fittings
November 5, 2010: Did a Little Firewall Forward Work
Engine Mount/Gear
April 25, 2010: Fit Engine Mount and Main Gear
April 26, 2010: Fit Left Main Gear Leg
April 28, 2010: Fit Right Main Gear Leg
May 1, 2010: Plane Is On Its Gear
Engine
May 8, 2010: Engine Accessories and Controls
May 13, 2010: Work on Seats, Engine Accessories
May 14, 2010: Engine Fittings, Firewall Pass-Throughs
May 15, 2010: Seats, Oil Temperature Sensor
May 30, 2010: Hung the Engine!
May 31, 2010: Mounted Exhaust
June 1, 2010: CHT sensors and lower plugs
June 3, 2010: Battery Positive Cable, Mixture Bellcrank
June 4, 2010: Swapped Rocker Cover Gaskets
June 6, 2010: Installed Exhaust Gas Temperature Probes
June 7, 2010: Installed Sump Plug and Mixture Bellcrank
June 16, 2010: Installed New Mixture Arm
June 22, 2010: Manifold Pressure Lines, Cabin Frame Joint
June 23, 2010: Misc Engine Tasks
July 1, 2010: Installed Hoses from Bonaco
July 7, 2010: Torqued Engine Attach Bolts
October 1, 2010: Received More Hoses From Bonaco
October 3, 2010: Fit Breather Tube
November 5, 2010: Did a Little Firewall Forward Work
November 7, 2010: Safety Wired Alternator Bracket Bolts
February 5, 2011: Baffles and Ignition Coils
February 6, 2011: Fabricated Ignition Coil Bracket
Engine Baffles
August 29, 2010: Started Baffling
January 30, 2011: Worked on Baffles
February 3, 2011: More Work on Baffles
February 5, 2011: Baffles and Ignition Coils
February 7, 2011: Worked on Right Front Baffles
February 8, 2011: Riveted Right and Left Front Baffles
Propeller
February 10, 2011: Installed Propeller
Cowling
February 11, 2011: Worked on Cowl Clearance
February 13, 2011: Worked on Cowl and Spinner Fit