Drilled Canopy Side Skirts
I laid out the holes for one of the side skirts, them clamped them together and drilled both at the same time. The plans show a uniform spacing for each row, but because the rivets are angled back at the aft end to follow the angle of the canopy frame, the plans show a slightly wider spacing for the upper row of rivets. Instead, I laid out all of the rivets on a 1.5" spacing except for the aft pair in the upper row which are about 1.7" apart. I also spent a little time trying to plan how I would fabricate the lift handle. I'm leaning towards cutting a slot in the side frame and skirt and installing the angle from the inside.

« Misc Firewall Forward Work and Resumed Canopy | Main Index | Archives | Dynon SkyView Supports the Vertical Power VP-X! »
0 TrackBacks
Listed below are links to blogs that reference this entry: Drilled Canopy Side Skirts.
TrackBack URL for this entry: http://www.jasonbeaver.com/mt/mt-tb.cgi/522

Leave a comment