Finished Riveting Canopy Frame

| | Comments (0) | TrackBacks (0)
I finished the blind rivets through the tubing earlier this week, and Andre stopped by today and helped me knock out the remaining rivets through the cabin frame reinforcements.  This really stiffened up the cabin frame.  Now that everything is locked in its final place, I can make the final canopy trims and drill the holes that define its final position.



0 TrackBacks

Listed below are links to blogs that reference this entry: Finished Riveting Canopy Frame.

TrackBack URL for this entry: http://www.jasonbeaver.com/mt/mt-tb.cgi/492

Leave a comment