Started Canopy Hinge

| | Comments (0) | TrackBacks (0)
I started working on the canopy hinge mechanism tonight.  First up is to rivet the outer subpanels to the forward ribs using the top two holes with flush rivets on the inside.  This is so the hinge blocks can be mounted flush to the ribs.



Caption



0 TrackBacks

Listed below are links to blogs that reference this entry: Started Canopy Hinge.

TrackBack URL for this entry: http://www.jasonbeaver.com/mt/mt-tb.cgi/444

Leave a comment