Installed Center Tunnel Nutplates
I installed the nutplates along both sides of the center tunnel in the seating area. This uses a mixture of one and two legged nutplates.

Next, I reinstalled the front and rear flap motor covers so that I could fit the remaining parts of the center console.

Next, I started fitting the z-channels that will support the center tunnel cover. There will be one of these on each side with a piece of 0.040" sheet connecting them.

Next, I reinstalled the front and rear flap motor covers so that I could fit the remaining parts of the center console.
Next, I started fitting the z-channels that will support the center tunnel cover. There will be one of these on each side with a piece of 0.040" sheet connecting them.
0 TrackBacks
Listed below are links to blogs that reference this entry: Installed Center Tunnel Nutplates.
TrackBack URL for this entry: http://www.jasonbeaver.com/mt/mt-tb.cgi/389

Leave a comment