Installed Center Tunnel Nutplates

| | Comments (0) | TrackBacks (0)
I installed the nutplates along both sides of the center tunnel in the seating area.  This uses a mixture of one and two legged nutplates.



Next, I reinstalled the front and rear flap motor covers so that I could fit the remaining parts of the center console.



Next, I started fitting the z-channels that will support the center tunnel cover.  There will be one of these on each side with a piece of 0.040" sheet connecting them.



0 TrackBacks

Listed below are links to blogs that reference this entry: Installed Center Tunnel Nutplates.

TrackBack URL for this entry: http://www.jasonbeaver.com/mt/mt-tb.cgi/389

Leave a comment