Wings off of the Jig!
Jenn helped me pull the wings down off of the jig this morning and put them in the cradle. This is a big milestone in the construction of the wings, and it feels really good to reach this point.

I did the ceremonial tearing down of the jig tonight after work. The garage feels so much bigger now. It's been about 4 1/2 months since I erected the wing jig, which seems to be faster than most. Given my pace, it looks like I'm on track to fly sometime in the first half of 2011.

I did the ceremonial tearing down of the jig tonight after work. The garage feels so much bigger now. It's been about 4 1/2 months since I erected the wing jig, which seems to be faster than most. Given my pace, it looks like I'm on track to fly sometime in the first half of 2011.
0 TrackBacks
Listed below are links to blogs that reference this entry: Wings off of the Jig!.
TrackBack URL for this entry: http://www.jasonbeaver.com/mt/mt-tb.cgi/211

Leave a comment