Wing Skin Prep

| | Comments (0) | TrackBacks (0)
Working on shims is slow tedious work, so I took a break tonight and started working on the main wing skins.  Here are the two wing walk doubler skins, deburred and dimpled.  These will be primed before installation since any water that seeps between the skins could be trapped there for a while before it dries out and I want to do everything I can to avoid corrosion.



I also started on one of the larger wing skins by removing the plastic along the rivet holes.  A 50 watt soldering iron makes extremely quick work of this.



0 TrackBacks

Listed below are links to blogs that reference this entry: Wing Skin Prep.

TrackBack URL for this entry: http://www.jasonbeaver.com/mt/mt-tb.cgi/183

Leave a comment

About this Entry

This page contains a single entry by Jason published on September 2, 2009 11:59 PM.

Finished Shims for Right Tank was the previous entry in this blog.

More Wing Skin Prep is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Contact

Pages

Powered by Movable Type 4.1