Prepping Tank Interior For Closing

| | Comments (0) | TrackBacks (0)
The progress has been slow the past week as I'm getting ready to fly our Cardinal to Oshkosh with my buddy Dan.  I want to get the tanks sealed up before we go though so that the sealant has 10 days to cure before I leak test them.

First up in prepping the tanks for closing is to install the vent lines and outboard capacitive sender plate.  The wire between the two plates is wrapped around the vent line and will be secured with a few dabs of tank sealant.



I also installed the flop-tube anti-hangup guides in both tanks using some 3/32" universal rivets.



0 TrackBacks

Listed below are links to blogs that reference this entry: Prepping Tank Interior For Closing.

TrackBack URL for this entry: http://www.jasonbeaver.com/mt/mt-tb.cgi/158

Leave a comment