Finished Interior Tank Ribs

| | Comments (0) | TrackBacks (0)
Andre stopped by again tonight and knocked out the remaining six interior tank ribs in about four hours.  I can pretty much finish the remaining rivets on the tank by myself from this point.



0 TrackBacks

Listed below are links to blogs that reference this entry: Finished Interior Tank Ribs.

TrackBack URL for this entry: http://www.jasonbeaver.com/mt/mt-tb.cgi/148

Leave a comment

About this Entry

This page contains a single entry by Jason published on June 24, 2009 11:06 PM.

Started Riveting Tank Ribs was the previous entry in this blog.

Fabricated Tank Vent Lines is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Contact

Pages

Powered by Movable Type 4.1