Vertical Stabilizer Structure Prep

| | Comments (0) | TrackBacks (0)
I worked a little bit yesterday getting the vertical stabilizer structure smoothed out in preparation for priming.



I also got the horizontal stabilizer tied up to the rafters so that it's out of the way.


I need to finish a couple of things on theĀ kitchen remodel, so I won't be able to make too much progress on the RV for a few days.

0 TrackBacks

Listed below are links to blogs that reference this entry: Vertical Stabilizer Structure Prep.

TrackBack URL for this entry: http://www.jasonbeaver.com/mt/mt-tb.cgi/46

Leave a comment

About this Entry

This page contains a single entry by Jason published on February 24, 2009 10:34 PM.

Finished Horizontal Stabilizer was the previous entry in this blog.

Prepped Vertical Stabilizer for Riveting is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Contact

Pages

Powered by Movable Type 4.1