Began Vertical Stabilizer
Since I need a riveting partner to begin riveting on the horizontal stabilizer skin, I went ahead and started on the vertical stabilizer. Here is the structure clecoed together.

And here it is will all holes drilled out to final size. I didn't get a picture of it, but I also clecoed on the skin and drilled all skin holes out to final size. I then disassembled and began deburring all of the components. I didn't even make it completely through VS-808PP (rear spar doubler, shown below with all the lightening holes). Just like the horizontal stabilizer rear spar doublers, I really want to get this part as close to perfect as possible since it carries a significant percentage of the load of the vertical stabilizer.

And here it is will all holes drilled out to final size. I didn't get a picture of it, but I also clecoed on the skin and drilled all skin holes out to final size. I then disassembled and began deburring all of the components. I didn't even make it completely through VS-808PP (rear spar doubler, shown below with all the lightening holes). Just like the horizontal stabilizer rear spar doublers, I really want to get this part as close to perfect as possible since it carries a significant percentage of the load of the vertical stabilizer.
« Horizontal Stabilizer Skins Finished | Main Index | Archives | Began Riveting Horizontal Stabilizer Skin »
0 TrackBacks
Listed below are links to blogs that reference this entry: Began Vertical Stabilizer.
TrackBack URL for this entry: http://www.jasonbeaver.com/mt/mt-tb.cgi/43

Leave a comment